Gerenciamento de riscos à atividade de manutenção e construção de redes de distribuição de energia elétrica: rede energizada
All activity being performed generates some kind of risk to your executor, this makes what the safety factor becomes a major issue when it comes to the scope of work of various kinds. Studies involving electricity are listed among the works of greatest risk, this risk is further aggravated when the...
Autor principal: | Piva, Cristiano |
---|---|
Formato: | Trabalho de Conclusão de Curso (Especialização) |
Idioma: | Português |
Publicado em: |
Universidade Tecnológica Federal do Paraná
2020
|
Assuntos: | |
Acesso em linha: |
http://repositorio.utfpr.edu.br/jspui/handle/1/22241 |
Tags: |
Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!
|
Resumo: |
All activity being performed generates some kind of risk to your executor, this makes what the safety factor becomes a major issue when it comes to the scope of work of various kinds. Studies involving electricity are listed among the works of greatest risk, this risk is further aggravated when the execution of the work for the power supply can not be turned off, causing the worker to perform his job under very high stress levels. Aiming safe driving the execution of the work, providing a security that is running, procedures that divert or eliminate the risks of time should be performed. For these procedures can be implemented, the risks that the activity is subjecting his executor, to this identification must be identified then a risk management, which identifies the risk it imposes preventive measures is implemented and also lists all personal protective equipment (PPE) and collective (EPC) to be used during execution. Utilizing the activity of maintaining and building distribution networks with energized electric power network, a risk management for such activity will be developed, based on the taking up of work done. |
---|