Estudo de viabilidade técnica e econômica para geração de energia em horário de ponta no câmpus Ecoville da Universidade Tecnológica Federal do Paraná na cidade de Curitiba

The present work aims at the analysis of electric energy costs on Campus Ecoville of Technological Federal University of Paraná, located in the city of Curitiba, through a study for personal generation of electricity. With the purpose of reduce excessive coast during peak time is proposed the implem...

ver descrição completa

Principais autores: Morimoto, Maurício Massao, Carmo, Pablo Rafael Sanches do, Chihaya, Wellyson
Formato: Trabalho de Conclusão de Curso (Graduação)
Idioma: Português
Publicado em: Universidade Tecnológica Federal do Paraná 2020
Assuntos:
Acesso em linha: http://repositorio.utfpr.edu.br/jspui/handle/1/8223
Tags: Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!
Resumo: The present work aims at the analysis of electric energy costs on Campus Ecoville of Technological Federal University of Paraná, located in the city of Curitiba, through a study for personal generation of electricity. With the purpose of reduce excessive coast during peak time is proposed the implementation of a motor group generator, scaled based on maximum demand and monthly consumption of electrical energy on campus. Due to unavailability of space for installation of the generator and others necessary devices there is the necessity of building an engine room to shelter de equipament. The transformer required for converting low voltage for medium voltage will be installed in the cabins reserves located in the substation. To ensure that the motor group generator be upon your full operating capacity whenever triggered it is essential that the equipment goes through a process of proper and careful maintenance. With the intention to prove the results of this study, the costs were raised directly with the specialized suppliers of services, equipaments and materials required for installation of the motor group generator. With the data collected, it was possible to reach a monthly saving of R$10.431,36 and a payback of 31 months, concluding that the monthly savings is considerable and the return of the investment is relatively short.